Standard Code | Standard Title | Standard Class | Order |
---|---|---|---|
GB/T 43595-2023 |
Guidelines for start-up testing and Commissioning of hydraulic turbines, water pump turbines and energy storage pumps {译} 水轮机、水泵水轮机和蓄能泵启动试验及试运行导则 |
China National Standards Commissioning |
English PDF |
GB/T 43540-2023 |
Technical requirements for deCommissioning lithium-ion batteries for electric energy storage {译} 电力储能用锂离子电池退役技术要求 |
China National Standards Commissioning |
English PDF |
GB/T 42737-2023 |
Commissioning procedures for electrochemical energy storage power stations {译} 电化学储能电站调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 41585-2022 |
Specifications for writing Commissioning program of pressurized water reactor nuclear power plant {译} 压水堆核电厂调试大纲编写规范 |
China National Standards Commissioning |
English PDF |
GB/T 41066.2-2022 |
Oil and gas drilling and production equipment Offshore oil semi-submersible drilling platform Part 2: Construction, installation, Commissioning and acceptance {译} 石油天然气钻采设备 海洋石油半潜式钻井平台 第2部分:建造安装和调试验收 |
China National Standards Commissioning |
English PDF |
GB/T 39184-2020 |
Code of practice for installation and Commissioning of ROV launch and recovery system/umbilical winch ROV收放装置/脐带绞车安装与调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 39206-2020 |
Code of practice for installation and Commissioning of fixed azimuth thruster 固定式全回转舵桨装置安装与调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 39207-2020 |
Code of practice for installation and Commissioning of anchor handling system 锚处理系统安装与调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 39208-2020 |
Code of practice for installation and Commissioning of retractable azimuth thruster 可伸缩式全回转舵桨装置安装与调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 51420-2020 |
Code for Commissioning and Acceptance of Smart substation 智能变电站工程调试及验收标准 |
China National Standards Commissioning |
English PDF |
GB/T 39230-2020 |
Code of practice for installation and Commissioning of heavy duty submarine cable recovery and releasing device 重型海底电缆收放装置安装与调试规程 |
China National Standards Commissioning |
English PDF |
GB/T 22135-2019 |
Commissioning of electrical,instrumentation and control systems in the process industry—Specific phases and milestones 流程工业中电气、仪表和控制系统的试车 各特定的阶段和里程碑 |
China National Standards Commissioning |
English PDF |
GB/T 37159.2-2019 |
Petroleum drilling and production equipment—Offshore self-elevating drilling unit—Part 2:Construction installation and Commissioning acceptance 石油天然气钻采设备 海洋石油自升式钻井平台 第2部分:建造安装与调试验收 |
China National Standards Commissioning |
English PDF |
GB/T 51338-2018 |
Distributed power grid-connected engineering Commissioning and acceptance criteria 分布式电源并网工程调试与验收标准 |
China National Standards Commissioning |
English PDF |
GB/T 51311-2018 |
Wind and light storage combined power station Commissioning and acceptance criteria 风光储联合发电站调试及验收标准 |
China National Standards Commissioning |
English PDF |
GB/T 35972-2018 |
Energy-saving Commissioning method of heating and air conditioning system 供暖与空调系统节能调试方法 |
China National Standards Commissioning |
English PDF |
GB/T 51189-2016 |
code for Commissioning and acceptance for seawater desalination project in thermal power plants 火力发电厂海水淡化工程调试及验收规范 |
China National Standards Commissioning |
English PDF |
GB/T 32156-2015 |
Commissioning specification for coal-fired flue gas denitration equipment 燃煤烟气脱硝技术装备调试规范 |
China National Standards Commissioning |
English PDF |
GB/T 29549.3-2013 |
Specification for offshore modular drillling rigs on fixed platforms - Part 3:Hook-up,Commissioning,and acceptance 海上石油固定平台模块钻机 第3部分:海上安装、调试与验收 |
China National Standards Commissioning |
English PDF |
GB/T 28551-2012 |
Technical guideline of centrifugal pump set Commissioning for nuclear power plant 核电厂离心泵组调试技术导则 |
China National Standards Commissioning |
English PDF |
GB/T 28550-2012 |
Piping verification requirement during nuclear power plant Commissioning 核电厂调试阶段管道验证要求 |
China National Standards Commissioning |
English PDF |
GB/T 28549-2012 |
Verification requirement of supports in nuclear island during nuclear power plant Commissioning 核电厂调试阶段核岛管道与主设备支吊装置验证要求 |
China National Standards Commissioning |
English PDF |
GB/T 25739-2010 |
Technical guideline of valves Commissioning for nuclear power plant 核电厂阀门调试技术导则 |
China National Standards Commissioning |
English PDF |
GB/T 25738-2010 |
Technical guideline of motor Commissioning for nuclear power plant 核电厂电动机调试技术导则 |
China National Standards Commissioning |
English PDF |
GB/T 14099.8-2009 |
Gas turbines - Procurement - Part 8: Inspection-testing-installation and Commissioning 燃气轮机 采购 第8部分:检查、试验、安装和调试 |
China National Standards Commissioning |
English PDF |
GB/T 14588-2009 |
Technical regulations for environmental management of reactor deCommissioning 反应堆退役环境管理技术规定 |
China National Standards Commissioning |
English PDF |
GB/Z 22135-2008 |
Milestones and activities during Commissioning of electrical instrumentation and control systems in the process industry 过程工业中电子设备和控制系统在调试中的标记和活动 |
China National Standards Commissioning |
English PDF |
GB/T 19597-2004 |
Safety requirements for deCommissioning of nuclear facilities 核设施退役安全要求 |
China National Standards Commissioning |
English PDF |
GB 14586-1993 |
Technical regulations for the environmental management of deCommissioning of uranium mining and milling facilities 铀矿冶设施退役环境管理技术规定 |
China National Standards Commissioning |
English PDF |
Find out:29Items | To Page of: First -Previous-Next -Last | 1 |