Standard Code | Standard Title | Standard Class | Order |
---|---|---|---|
TB/T 30001-2020 |
Railway receiving and dispatching train operations {译} 铁路接发列车作业 |
China Railway Transport Industry
Standards Operation receiving |
English PDF |
SY/T 6928-2012 |
Operation regulation for liquefied natural gas receiving terminal 液化天然气接收站运行规程 |
China Oil & Gas Industry
Standards Operation receiving |
English PDF |
TB/T 1500.8-2009 |
Operation of receiving and departing trains. Part 8: On signle-lines auto-blocking and centralized interlocking between stations(without signalman) 接发列车作业 第8部分 单线自动站间闭塞集中联锁(未设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.7-2009 |
Operation of receiving and departing trains. Part 7: On signle-lines auto-blocking and centralized interlocking between stations(with signalman) 接发列车作业 第7部分 单线自动站间闭塞集中联锁(设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.6-2009 |
Operation of receiving and departing trains. Part 6: On single and double lines with telephone block and without interlocking 接发列车作业 第6部分 单双线电话闭塞无联锁 |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.5-2009 |
Operation of receiving and departing trains. Part 5: On signle and double lines with semi-auto-blocking and colorlight electric interlocking 接发列车作业 第5部分 单双线半自动闭塞色灯电锁器联锁 |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.4-2009 |
Operation of receiving and departing trains. Part 4: On single and double Lines with semi-auto-blocking and centralized interlocking(without signalman) 接发列车作业 第4部分 单双线半自动闭塞集中联锁(未设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.3-2009 |
Operation of receiving and departing trains. Part 3: On single and double lines with semi-auto-blocking and centralized interlocking(with signalman) 接发列车作业 第3部分 单双线半自动闭塞集中联锁(设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.2-2009 |
Operation of receiving and departing trains. Part 2: On double lines with auto-blocking and centralized interlocking(without signalman) 接发列车作业 第2部分 双线自动闭塞集中联锁(未设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
TB/T 1500.1-2009 |
Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman) 接发列车作业 第1部分 双线自动闭塞集中联锁(设信号员) |
China Railway & Train
Standards Operation receiving |
English PDF |
JT/T 673-2006 |
Requirements of receiving and disposing demands of units/enterprises operating shipFs pollutants disposal and tank cleaning operation 船舶污染物接收和船舶清舱作业单位接收处理能力要求 |
China Highway & Transportation
Standards Operation receiving |
English PDF |
Find out:11Items | To Page of: First -Previous-Next -Last | 1 |