Standard Code | Standard Title | Standard Class | Order |
---|---|---|---|
SY/T 4210-2017 |
(Code for acceptance of construction quality of oil and gas construction project road engineering) 石油天然气建设工程施工质量验收规范 道路工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
NB/T 20399-2017 |
(Code for construction and quality acceptance of concrete structures related to nuclear safety in PWR nuclear power plants) 压水堆核电厂核安全相关的混凝土结构施工及质量验收规范 |
China Energy industry
Standards Quality acceptance code |
English PDF |
CJJ 266-2017 |
(Code for construction and quality acceptance of trapezoidal sleeper track in urban rail transit) 城市轨道交通梯形轨枕轨道工程施工及质量验收规范 |
China Urban Construction industry
Standards Quality acceptance code |
English PDF |
SY/T 4208-2016 |
Code for quality acceptance of oil and gas construction engineering. Long-distance transmission pipeline engineering 石油天然气建设工程施工质量验收规范长输管道线路工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.4-2016 |
(Code for acceptance of construction quality of conventional and auxiliary facilities for nuclear power plants - Part 4: Thermal instrumentation and control devices) 核电厂常规岛及辅助配套设施建设施工质量验收规程 第 4 部分:热工仪表及控制装置 |
China Energy industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.8-2016 |
(Code for acceptance of construction quality of conventional island and auxiliary facilities in nuclear power plants - Part 8: Thermal insulation and paints) 核电厂常规岛及辅助配套设施建设施工质量验收规程 第8部分:保温及油漆 |
China Energy industry
Standards Quality acceptance code |
English PDF |
SY 4205-2016 |
Code for quality acceptance of oil and gas construction engineering. Automation instrumentation engineering 石油天然气建设工程施工质量验收规范 自动化仪表工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4202-2016 |
Code for quality acceptance of oil and gas construction engineering. Storage tank project 石油天然气建设工程施工质量验收规范 储罐工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4201.4-2016 |
Code for quality acceptance of oil and gas construction engineering. Equipment installation engineering. Part 4-Furance 石油天然气建设工程施工质量验收规范 设备安装工程 第4部分:炉类 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4201.3-2016 |
Code for quality acceptance of oil and gas construction engineering. Equipment installation engineering. Part3: Container 石油天然气建设工程施工质量验收规范 设备安装工程 第3部分:容器类 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4201.2-2016 |
Code for quality acceptance of oil and gas construction engineering. Equipment installation engineering. Part2: Column 石油天然气建设工程施工质量验收规范 设备安装工程 第2部分:塔类 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4201.1-2016 |
Code for quality acceptance of oil and gas construction engineering Equipment installation engineering - Part 1: Mechanism and pump 石油天然气建设工程施工质量验收规范 设备安装工程 第1部分:机泵类 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.7-2016 |
Code for construction quality acceptance of nuclear power conventional island and balance of plant Part 7: Heating ventilation and air conditioning 核电厂常规岛及辅助配套设施建设 施工质量验收规程 第7部分:采暖通风与空气调节 |
China Energy industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.5-2016 |
Code for construction quality acceptance of nuclear power conventional island and balance of plant Part 5: The system with the water treatment and hydrogen generation 核电厂常规岛及辅助配套设施建设 施工质量验收规程 第5部分:水处理及制氢系统 |
China Energy industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.6-2016 |
(Code for acceptance of construction quality of conventional island and auxiliary facilities of nuclear power plant - Part 6: Pipeline) |
China Energy industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.3-2014 |
Code for construction quality acceptance of nuclear power conventional island and balance of plant. Part 3: Circulating water system equipments 核电厂常规岛及辅助配套设施建设施工质量验收规程 第3部分:循环水系统设备 |
China Energy industry
Standards Quality acceptance code |
English PDF |
NB/T 25044.1-2014 |
Code for construction quality acceptance of nuclear power conventional bland and balance of plant. Part 1: Civil work 核电厂常规岛及辅助配套设施建设施工质量验收规程 第1部分:土建 |
China Energy industry
Standards Quality acceptance code |
English PDF |
CJJ/T 208-2014 |
Code for construction and quality acceptance of phosphate tailing ore of road base (pad) layer 磷矿尾矿砂道路基(垫)层施工及质量验收规范 |
China Urban Construction industry
Standards Quality acceptance code |
English PDF |
NB/T 10004-2014 |
Code for acceptance of construction quality of coalbed methane fracturing 煤层气井压裂施工质量验收规范 |
China Energy industry
Standards Quality acceptance code |
English PDF |
DL/T 5295-2013 |
Code for the unit commissioning quality acceptance and evaluation of fossil power construction projects 火力发电建设工程机组调试质量验收及评价规程 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
JGJ/T 304-2013 |
Code for construction quality acceptance of housing interior decorati on 住宅室内装饰装修工程质量验收规范 |
China Building & Construction
Standards Quality acceptance code |
English PDF |
SY/T 6770.4-2012 |
Quality acceptance code of non-metalic pipes. Part 4: Steel skeleton reinforced plastic coiled composite pipes 非金属管材质量验收规范 第4部分:钢骨架增强塑料复合连续管 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 6879-2012 |
Code for quality acceptance of oil and gas construction engineering. Seawall engineering in beach-shallow sea 石油天然气建设工程施工质量验收规范 滩海海堤工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4213-2010 |
Code for quality acceptance of oil and gas construction engineering. Gathering and transmission pipelining projects in highly hydrogen sulfide gas field 石油天然气建设工程施工质量验收规范 高含硫化氢气田集输管道工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4212-2010 |
Code for quality acceptance of oil and gas construction engineering. Gathering and transmission distributing station projects in highly hydrogen sulfide gas field 石油天然气建设工程施工质量验收规范 高含硫化氢气田集输场站工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY/T 6770.3-2010 |
Quality acceptance code of non-metalic pipe. Part 3: Anticorrosion plastic alloy composite pipe 非金属管材质量验收规范 第3部分:塑料合金防腐蚀复合管 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY/T 6770.2-2010 |
Quality acceptance code of non-metalic pipe. Part 2: Steel skeleton polyethylene plastic composite pipe 非金属管材质量验收规范 第2部分:钢骨架聚乙烯塑料复合管 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY/T 6770.1-2010 |
Quality acceptance code of non-metalic pipe. Part 1: High-pressure fiberglass line pipe 非金属管材质量验收规范 第1部分:高压玻璃纤维管线管 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
DL/T 5210.7-2010 |
Code for construction quality acceptance and evaluation of electric power construct. Part 7: welding 电力建设施工质量验收及评定规程 第7部分:焊接 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
SY 4211-2009 |
Code for quality acceptance of oil and gas construction engineering. Bridge Engineering 石油天然气建设工程施工质量验收规范 桥梁工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4210-2009 |
Code for quality acceptance of oil and gas construction engineering. Road engineering 石油天然气建设工程施工质量验收规范 道路工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
DL/T 5210.8-2009 |
Code for construction quality acceptance and evaluation of electric power construct. Part 8: Processing preparation 电力建设施工质量验收及评价规程 第8部分:加工配制 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
DL/T 5210.5-2009 |
Code for construction quality acceptance and evaluation of electric power construct. Part 5: Piping and System 电力建设施工质量验收及评价规程 第5部分:管道及系统 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
DL/T 5210.4-2009 |
Code for construction quality acceptance and evaluation of electric power construct. Part 4: Instrumentation and control 电力建设施工质量验收及评价规程 第4部分:热工仪表及控制装置 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
DL/T 5210.3-2009 |
Code for construction quality acceptance and evaluation of electric power construct. Part 3: turbine generator unit 电力建设施工质量验收及评价规程 第3部分:汽轮发电机组 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
DL/T 5210.2-2009 |
Code for construction quality acceptance and evaluation of electric power construct. Part 2: Boiler unit 电力建设施工质量验收及评价规程 第2部分:锅炉机组 |
China Electricity & Power
Standards Quality acceptance code |
English PDF |
CJJ 2-2008 |
Code for construction and quality acceptance of bridge works in city 城市桥梁工程施工与质量验收规范 |
China Urban Construction industry
Standards Quality acceptance code |
English PDF |
CJJ 1-2008 |
Code for construction and quality acceptance of road works in city and town 城镇道路工程施工与质量验收规范 |
China Urban Construction industry
Standards Quality acceptance code |
English PDF |
GY 5077-2007 |
Code for acceptance of quality of steel tower and mast of radio television mirowave communication 广播电视微波通信铁塔及桅杆质量验收规范 |
China Radio, Film & TV Industry
Standards Quality acceptance code |
English PDF |
SY 4207-2007 |
Code for quality acceptance of oil and gas construction engineering Pipeline crossing and aerial crossing engineering 石油天然气建设工程施工质量验收规范 管道穿跨越工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4206-2007 |
Code for quality acceptance of oil and gas construction engineering Electrical engineering 石油天然气建设工程施工质量验收规范 电气工程 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
SY 4200-2007 |
Code for quality acceptance of oil and gas construction engineering. General rule 石油天然气建设工程施工质量验收规范 通则 |
China Oil & Gas Industry
Standards Quality acceptance code |
English PDF |
QB/T 6019-2004 |
Code for acceptance of constructional quality of installation engineering for pulp and paper machines 制浆造纸专业设备安装工程施工质量验收规范 |
China Light Industry
Standards Quality acceptance code |
English PDF |
Find out:43Items | To Page of: First -Previous-Next -Last | 1 |